Energy transformation is not just about strategy and documents – it’s primarily about specific installations operating continuously in a demanding industrial environment.
For one of Poland’s key power plants, we implemented a biomass unloading, transport, and dosing system with a capacity of 500 t/h. The project was completed on a turnkey basis – from conceptual and design work, through prefabrication and assembly, to commissioning.
The Role of the System
The completed system is a fundamental element of the power plant’s decarbonization process, enabling its continued operation in the capacity market while meeting current environmental requirements.
Key project requirements:
▪️ very short implementation time, including design, prefabrication, assembly, and commissioning,
▪️ maximum simplification of administrative procedures,
▪️ high reliability of continuous operation,
▪️ meeting rigorous safety standards for installations in critical locations,
▪️ maximum utilization of the investor’s existing infrastructure and resources.
In biomass installations, the key challenge isn’t efficiency itself, but rather the stability of the material flow with variable grain size, moisture content, and density, while maintaining safe and repeatable dosing.
Why is it important?
A well-designed biomass unloading and transport system:
✔️ increases operational safety,
✔️ minimizes the risk of downtime,
✔️ supports decarbonization goals without technological compromise.
At Biko Tech, we combine process engineering, industrial experience, and a practical approach to turnkey implementation – especially where there is no room for error.